Georgia's Erosion Compliance Experts

Georgia's Trusted Erosion Inspection Experts

We guide contractors, developers, and municipalities through NPDES permit compliance and land disturbance requirements, with certified field inspections and rapid reporting across all of Georgia.

+

Inspections Completed

+

Years of Experience

Georgia Counties Served

Certified Inspectors

What We Do

Comprehensive Inspection Services

From initial site assessment to final stabilization, we provide the inspection and compliance support your project needs to stay on schedule and out of trouble.

Dirt road with construction and erosion control.
Clipboard icon with checkboxes on white background.

Erosion & Sediment Control Inspections

Routine and as-needed site inspections to verify that erosion and sediment controls are properly installed, maintained, and functioning as required by your land disturbance permit.

Worker writing on clipboard at construction site.
Shield icon with checkmark on white background.

NPDES Permit Compliance

Expert guidance on Georgia EPD's NPDES General Permit for Construction Activity — from SWPPP preparation to inspection documentation and corrective action tracking.

Construction site with gravel and erosion barrier.
Green check mark inside a circle icon.

BMP Installation Oversight

On-site oversight to ensure best management practices are installed correctly and meet permit specifications — reducing your risk of violations and costly corrective actions.

Field Reference

BMPs We Inspect

Recognizing the right BMP for the right condition is what separates a compliant site from a violation. Here are the common best management practices our inspectors evaluate on every visit.

Grass path between orange and black barriers.
BMP

Silt Fence

Perimeter barrier that intercepts sheet flow and filters sediment before it leaves the site.

Pond drainage system with metal and concrete components.
BMP

Sediment Basin

Temporary impoundment that captures and settles sediment-laden runoff from disturbed areas.

Covered structure on construction site under clouds.
BMP

Inlet Protection

Filters placed at storm drain inlets to prevent sediment from entering the stormwater system.

Erosion control with rocks on grassy slope.
BMP

Check Dam

Rock or straw wattle structures placed in drainage channels to slow flow and trap sediment.

Gravel road under construction with machinery.
BMP

Construction Exit Pad

Aggregate pad at site exits that removes mud and debris from vehicle tires before they reach public roads.

Bridge over straw-covered slope and rocks.
BMP

Slope Stabilization

Erosion control blankets, hydroseeding, and matting that protect disturbed slopes from rainfall impact.

Why GEIC

The Compliance Partner Your Project Deserves

Navigating Georgia's erosion and sediment control requirements doesn't have to be stressful. Our certified inspectors bring deep regulatory knowledge and real-world experience to every project—so you can focus on building while we handle compliance.

Shield icon with checkmark on white background.

Certified Inspectors

All inspectors hold current CPESC, CESSWI, or state-recognized certifications—so your project stays compliant.

Clipboard icon with checkboxes on white background.

Rapid Reporting

Inspection reports delivered within 24 hours, giving you the documentation you need before regulators ask.

Green check mark inside a circle icon.

Statewide Coverage

From metro Atlanta to coastal Georgia, we cover all 159 counties with local knowledge and regulatory expertise.

Right arrow icon on light background.

Regulatory Expertise

Deep familiarity with EPD, NPDES General Permit, and local MS4 requirements keeps your project on the right side of the law.

Stay Compliant. Avoid Fines. Protect Georgia's Waterways.

Don't wait for a notice of violation. Our inspectors are ready to assess your site and keep your project on track.